Inside 84045

Saratoga Springs Utah, 84045 – Inside 84045

[Saratoga Springs News] 2100 North Update

SSNews | September 2, 2010

The following are planned activities for the coming week. Please note that due to weather, project conflicts, or equipment/supply issues, schedules are subject to change.

Steel posts and mast arms for the traffic signals at 2300 W. will be installed this week. (see below for details) 
Current Construction Activities

Work to install the steel posts and mast arms [...]

[Saratoga Springs News] SARATOGA SPRINGS APPOINTS NEW CITY MANAGER

SSNews | September 1, 2010

 
The City of Saratoga Springs is proud to announce that Mark Christensen has been appointed as the next City Manager of Saratoga Springs.  Mr. Christensen was the Mayor and City Council’s unanimous top choice after a recruitment that included 55 applicants for the position.  Mr. Christensen was appointed during a special City Council meeting held [...]

[Saratoga Springs News] Road Closure Notice

SSNews | August 31, 2010

Timpanogos Special Service District, in conjunction with Saratoga Springs City and Insituform, Inc. will be performing sewer line maintenance on the District’s 54″ sewer trunk line and associated structues in the intersection of Saratoga Road and 145 North (7350 North).
The maintenance work will include inserting a new cured-in-place pipe liner into the existing concrete pipe [...]

[Saratoga Springs News] Pioneer Crossing Update

SSNews | August 30, 2010

Please note: Schedule changes and additions to this week’s update are underlined.
This update will now be sent every two weeks as needed.
Pioneer Crossing is open. Additional work will occur off of the roadway through mid- October while crews complete the last remaining items.
900 West is closed while crews reconstruct the roadway and complete utility work. [...]

[Saratoga Springs News] SR-68 Project Update

SSNews | August 26, 2010

Work for the coming week: 
Storm Drain

The storm drain is fully installed and all work on this is finished. 

Pedestrian Trail

The trail on Redwood Road adjacent to the Saratoga Springs development is closed from the north end of the development to Lakeview Terrace.  The existing trail has been removed and a new trail will be built on [...]

[Saratoga Springs News] Redwood Road-Pelican Point to 400 South

SSNews | August 25, 2010

What:  UDOT is currently working on the Redwood Road Construction Project.  The work will be complete by November 1, 2010. 
Activities Include:

Installation of Storm Drain Pipe – From Lakeview Terrace to 1200 feet north of Grandview a new drainage system will be installed to help eliminate ponding that occurs in that area. 
Road Widening – From 400 [...]

[Saratoga Springs News] 2100 North Project Update

SSNews | August 24, 2010

The following are planned activities for the coming week. Please note that due to weather, project conflicts, or equipment/supply issues, schedules are subject to change.

Measures are now in place along the west side of the 2100 N./2300 W. intersection to ensure the safety of children walking to school. (see details below) 
As a reminder, for the [...]

[Saratoga Springs News] Pioneer Crossing Update

SSNews | August 23, 2010

Please note: Schedule changes and additions to this week’s update are underlined.
The Pioneer Crossing Project will open on Aug. 23, 2010, at 8 a.m. That will include the six-mile roadway from Redwood Road in Saratoga Springs to the intersection of Main Street and U.S. 89 in American Fork, as well as the new Diverging Diamond [...]

[Saratoga Springs News] Mountain View Corridor Update

SSNews | August 20, 2010

Construction crews have begun utility and roadway work on Mountain View Corridor.  See below for specific construction activities on cross streets.
12600 South: Construction on 12600 South has begun.  Lane restrictions and flagging operations will be in place between Legacy Ranch Boulevard and Herriman City Main Street.  These restrictions will be in place for approximately two weeks* during non-peak hours [...]

[Saratoga Springs News] SR-68 Update

SSNews | August 19, 2010

Work for the coming week: 
Storm Drain 

Crews will continue working on the installation of the storm drain.  Crews are currently just south of Grandview Blvd. 

Pedestrian Trail 

The trail on Redwood Road adjacent to the Saratoga Springs development is closed from the north end of the development to Lakeview Terrace.  The existing trail has been removed and a [...]